Log in



Lost your password?
  • FREE TRIAL
  • ABOUT
    • About EnerKnol
    • Company News
    • Careers at EnerKnol
    • Press
  • PRODUCT
    • About the EnerKnol Platform
    • Why EnerKnol
    • Source Coverage
    • Get Access to the EnerKnol Platform
  • ANALYST RESEARCH
    • Renewables
    • Environmental Markets
    • Fossil Fuels
    • Power & Utilities
    • View All Research
    • Get EnerKnol Research
  • EVENTS
    • EnerKnol Calendar
    • New York Energy Week
  • NEWS
  • SUBSCRIBE
MENU
Login

Access the EnerKnol platform

EnerKnol
EnerKnol is the leading provider of regulatory data, analytics, and tracking software for North American energy markets
EnerKnol
  • FREE TRIAL
  • ABOUT
    • About EnerKnol
    • Company News
    • Careers at EnerKnol
    • Press
  • PRODUCT
    • About the EnerKnol Platform
    • Why EnerKnol
    • Source Coverage
    • Get Access to the EnerKnol Platform
  • ANALYST RESEARCH
    • Renewables
    • Environmental Markets
    • Fossil Fuels
    • Power & Utilities
    • View All Research
    • Get EnerKnol Research
  • EVENTS
    • EnerKnol Calendar
    • New York Energy Week
  • NEWS
  • SUBSCRIBE
Search:
FERC Grants Extension of California Grid Operator Rules to Tackle Supply Shortages From 2015 Aliso Canyon Gas Leak

The Federal Energy Regulatory Commission accepted California Independent System Operator Corporation’s request for a one-year extension of market rule changes to manage natural gas constraints posed by limited operability of the Aliso Canyon storage facility following a major gas leak in October 2015, according to a Nov. 26 order. The facility, operated by Southern California Gas Company, has been partially restored since the leak, but the region continues to face supply shortages due to limitations on withdrawals, pipeline outages, and declines in inventory. For the 2018-2019 winter, the grid operator expects gas system capacity conditions to be virtually unchanged compared to the prior winter, but anticipates minimum generation requirements to be higher. After the leak, the total capacity in the company’s service territory dropped by nearly half from 136 billion cubic feet to 74 billion cubic feet, according to a June report from the Energy Information Administration. The commission approved six of the seven rule changes to remain in place until Dec. 31, 2019. FERC authorized the revisions in June 2016 to provide the grid operator with a set of tools on a temporary basis to address the reliability and market distortion risks posed by the constraints, and subsequently allowed one-year extensions.

November 26, 2018
Share
TweetShare on Twitter Share on FacebookShare on Facebook Share on LinkedInShare on LinkedIn

Post navigation

PreviousPrevious post:SCANA Reaches $2 Billion Settlement to Resolve Ratepayer Lawsuit Over Failed Nuclear PlantNextNext post:Duke Energy Progress to Return $104 Million in Federal Tax Cut Savings to North Carolina Customers

Related Research

Ohio Lawmakers Pass Bill to Revoke $1.1 Billion Nuclear Subsidy
U.S. Energy Department Awards $800 Million for Small Modular Reactor Projects in Tennessee and Michigan
December 3, 2025
solar panels wind turbines with clouds sky renewable energy 1
MISO Advances 15 New Projects Through Accelerated Interconnection Review as Reliability Pressures Mount
December 2, 2025
Colorado Passes Bill Aiming for 90 Percent Emissions Reduction by 2050
EPA Finalizes Extensions of Methane Emission Requirements for Oil and Gas Industry
December 1, 2025
New York Advances $485 Million Transmission Project to Enhance Grid Reliability, Support Renewables
New York Launches $300 Million POWER UP Program to Prepare Industrial Sites for Advanced Manufacturing
December 1, 2025
U.S. Energy Department Awards $28 Million to Enhance Energy Infrastructure Cybersecurity
U.S. Energy Department Launches Genesis Mission to Accelerate Artificial Intelligence in Energy and National Security
November 26, 2025
steel long pipes pipe elbow station oil factory during refinery petrochemistry industry gas site distillery
U.S. Interior Department Initiates Overhaul of National Offshore Oil and Gas Leasing Strategy
November 21, 2025
New York Advances $485 Million Transmission Project to Enhance Grid Reliability, Support Renewables
Texas Approves Loan for 455-Megawatt NRG Gas Plant to Strengthen Grid Reliability
November 21, 2025
Mitsubishi Hitachi Wins Contract to Facilitate Transition of Utah Coal-Fired Facility to Hydrogen Power Plant
U.S. Energy Department Extends Emergency Order to Keep Michigan Coal Plant Running Through Winter
November 20, 2025
  • Renewables
    • Biofuels
    • Electric Vehicles
    • Hydropower
    • Nuclear Power
    • Solar Power
    • Wind Power
  • Environmental Markets
    • Carbon Markets
    • Emissions
  • Fossil Fuels
    • Coal Power
    • Natural Gas
    • Oil
  • Power & Utilities
    • Energy Efficiency
    • Energy Storage
    • Retail Power & Gas
    • Smart Grid
    • Wholesale Markets

Subscribe To Our Research Newsletter!


First Name *
Last Name *
Email Address *
Phone *
Company *
Job Title *
Select any sectors you're interested in

Submit Form
https://enerknol.com/?p=25445
EnerKnol
Copyright (C) EnerKnol, Inc. | 175 Greenwich Street, FL-38 New York, NY 10007 | (212) 537-4797 | sales@enerknol.com | Terms & Conditions       Visit EnerKnol on YouTube  Visit EnerKnol on Facebook  Visit EnerKnol on Twitter  Visit EnerKnol on LinkedIn