Log in



Lost your password?
  • FREE TRIAL
  • ABOUT
    • About EnerKnol
    • Company News
    • Careers at EnerKnol
    • Press
  • PRODUCT
    • About the EnerKnol Platform
    • Why EnerKnol
    • Source Coverage
    • Get Access to the EnerKnol Platform
  • ANALYST RESEARCH
    • Renewables
    • Environmental Markets
    • Fossil Fuels
    • Power & Utilities
    • View All Research
    • Get EnerKnol Research
  • EVENTS
    • EnerKnol Calendar
    • New York Energy Week
  • NEWS
  • SUBSCRIBE
MENU
Login

Access the EnerKnol platform

EnerKnol
EnerKnol is the leading provider of regulatory data, analytics, and tracking software for North American energy markets
EnerKnol
  • FREE TRIAL
  • ABOUT
    • About EnerKnol
    • Company News
    • Careers at EnerKnol
    • Press
  • PRODUCT
    • About the EnerKnol Platform
    • Why EnerKnol
    • Source Coverage
    • Get Access to the EnerKnol Platform
  • ANALYST RESEARCH
    • Renewables
    • Environmental Markets
    • Fossil Fuels
    • Power & Utilities
    • View All Research
    • Get EnerKnol Research
  • EVENTS
    • EnerKnol Calendar
    • New York Energy Week
  • NEWS
  • SUBSCRIBE
Search:
FERC Approves Venture Global LNG’s Louisiana Export Terminal, Takes New Approach to Consider Emissions

The Federal Energy Regulatory Commission on Feb. 21 cleared Venture Global Calcasieu Pass LLC’s proposed liquefied natural gas export project in Cameron Parish, Louisiana and TransCameron Pipeline LLC’s associated natural gas pipeline. Commissioner Cheryl LaFleur voted for the project commending the commission’s new approach to calculate the direct greenhouse emissions of the project. Commissioner Richard Glick dissented saying that the commission refuses to consider the implications of the direct emissions analysis and ignores the potential contribution to climate change.

Chairman Neil Chatterjee said he anticipates that the new approach would provide the framework to assess pending LNG certifications. In recent FERC approvals that drew attention to the commission’s divided approach to assess greenhouse gas emissions, LaFleur has voted against certain projects reiterating the need to account for the climate impacts of natural gas infrastructure.

The proposed export terminal, which would be constructed on an 828-acre site, is designed to have a capacity of 10 million metric tons per annum, with a peak achievable capacity of 12 million metric tons under optimal operating conditions. The facility would receive natural gas via TransCameron’s proposed East Lateral pipeline. The 23.4 mile-pipeline would be able to provide up to 2,125,000 dekatherms per day of natural gas transportation service.

Calcasieu Pass and TransCameron are subsidiaries of Venture Global LNG, Inc.

February 25, 2019
Share
TweetShare on Twitter Share on FacebookShare on Facebook Share on LinkedInShare on LinkedIn

Post navigation

PreviousPrevious post:New England’s Evolving Resource Mix Makes Power System Operations More Complex: ISO-NE ReportNextNext post:Connecticut Legislature Floats Bill to Protect Consumers from Predatory Sales Tactics

Related Research

Ohio Lawmakers Pass Bill to Revoke $1.1 Billion Nuclear Subsidy
U.S. Energy Department Awards $800 Million for Small Modular Reactor Projects in Tennessee and Michigan
December 3, 2025
solar panels wind turbines with clouds sky renewable energy 1
MISO Advances 15 New Projects Through Accelerated Interconnection Review as Reliability Pressures Mount
December 2, 2025
EnerKnol Research PU Visual Primer Trumps Fossil Fuel Push 2025 12 02 Blog preview
Federal Policy Shifts Reinforce U.S. Fossil Fuel Push
December 1, 2025
EnerKnol Research PU Visual Primer Trumps Fossil Fuel Push 2025 12 02 Blog preview
Visual Primer: Federal Policy Shifts Reinforce U.S. Fossil Fuel Push
December 1, 2025
Colorado Passes Bill Aiming for 90 Percent Emissions Reduction by 2050
EPA Finalizes Extensions of Methane Emission Requirements for Oil and Gas Industry
December 1, 2025
New York Advances $485 Million Transmission Project to Enhance Grid Reliability, Support Renewables
New York Launches $300 Million POWER UP Program to Prepare Industrial Sites for Advanced Manufacturing
December 1, 2025
Week Ahead: AI Infrastructure Development, RGGI’s Carbon Auction, NY’s Climate Smart Communities Project
November 26, 2025
U.S. Energy Department Awards $28 Million to Enhance Energy Infrastructure Cybersecurity
U.S. Energy Department Launches Genesis Mission to Accelerate Artificial Intelligence in Energy and National Security
November 26, 2025
  • Renewables
    • Biofuels
    • Electric Vehicles
    • Hydropower
    • Nuclear Power
    • Solar Power
    • Wind Power
  • Environmental Markets
    • Carbon Markets
    • Emissions
  • Fossil Fuels
    • Coal Power
    • Natural Gas
    • Oil
  • Power & Utilities
    • Energy Efficiency
    • Energy Storage
    • Retail Power & Gas
    • Smart Grid
    • Wholesale Markets

Subscribe To Our Research Newsletter!


First Name *
Last Name *
Email Address *
Phone *
Company *
Job Title *
Select any sectors you're interested in

Submit Form
https://enerknol.com/?p=27424
EnerKnol
Copyright (C) EnerKnol, Inc. | 175 Greenwich Street, FL-38 New York, NY 10007 | (212) 537-4797 | sales@enerknol.com | Terms & Conditions       Visit EnerKnol on YouTube  Visit EnerKnol on Facebook  Visit EnerKnol on Twitter  Visit EnerKnol on LinkedIn