Log in



Lost your password?
EnerKnol
  • Home
  • About
  • EK Research
  • News
  • Platform
  • Coverage
  • Case Studies
  • EnerKnol Calendar
  • Press
Log on To EnerKnol Platform Book Demo
  • Home
  • About
  • EK Research
  • News
  • Platform
  • Coverage
  • Case Studies
  • EnerKnol Calendar
  • Press
Login Book Demo
New England Grid Operator Anticipates Adequate Supplies to Meet Winter Demand

ISO New England Inc. is equipped to meet winter demand which is forecast to peak at 20,357 megawatts under normal conditions and 21,057 megawatts at extreme temperatures, according to a Nov. 28 press release. Based on lessons learned from last winter, the grid operator recently unveiled new initiatives including a 21-day forecast of the region’s available fuel supplies and a market-based mechanism that improves reliability and cost-effectiveness by conserving fuel for the times when it will be needed most. The previous winter’s two-week cold spell caused the system to rely heavily on power generation from using oil stored in onsite tanks, forcing oil-powered plants to face the risk of running out of fuel. Last winter’s demand peaked at 20,631 megawatts. This will be the first winter under the ISO-NE’s “pay-for-performance” market design, which rewards or penalizes power resources ensuring that they are prepared to meet their obligations to provide energy and reserves or reduce demand when the system is stressed. In the event of unexpected outages, the grid operator has operation procedures in place such as importing emergency power and asking consumers to voluntarily conserve power in order to maintain reliability.

November 28, 2018
Share
TweetShare on Twitter Share on FacebookShare on Facebook Share on LinkedInShare on LinkedIn

Post navigation

PreviousPrevious post:TransCanada Allowed to Conduct Preliminary Work on Keystone XL Oil Pipeline While Construction Remains BlockedNextNext post:The Renewable Green Wave Promised by Democratic Electoral Victories

Related Research

6 1
California Regulator Shifts $1.4 Billion Climate Credits to Peak Months to Cut Energy Bill Spikes
May 1, 2026
Image4
Generation Projects Totaling 220 Gigawatts Enter PJM Queue Under New Interconnection Framework
April 30, 2026
Week Ahead: CA’s Summer Reliability Outlook, NY Examines Interconnection Policies, Carbon Sequestration Permitting
April 30, 2026
Image21
BLM Oil and Gas Lease Sale in the Dakotas Generates Over $44 Million
April 30, 2026
EnerKnol Research PU Visual Primer Coal 2026 04 28 Blog preview
Policy Actions Delay Planned U.S. Coal Plant Retirements Over Reliability Concerns
April 27, 2026
EnerKnol Research PU Visual Primer Coal 2026 04 28 Blog preview
Visual Primer: Policy Actions Delay Planned U.S. Coal Plant Retirements Over Reliability Concerns
April 27, 2026
6 1
New York Grid Operator Warns of Record-Low Summer Reliability Margin
April 27, 2026
Week Ahead: WA Examines Data Center Impacts, DOE Advances Genesis Mission, Cross-Border Pipeline Expansion
April 24, 2026
  • Renewables
    • Biofuels
    • Electric Vehicles
    • Hydropower
    • Nuclear Power
    • Solar Power
    • Wind Power
  • Environmental Markets
    • Carbon Markets
    • Emissions
  • Fossil Fuels
    • Coal Power
    • Natural Gas
    • Oil
  • Power & Utilities
    • Energy Efficiency
    • Energy Storage
    • Retail Power & Gas
    • Smart Grid
    • Wholesale Markets

Subscribe To Our Research Newsletter!


First Name *
Last Name *
Email Address *
Phone *
Company *
Job Title *
Select any sectors you're interested in

Submit Form
https://enerknol.com/?p=25437
EnerKnol

The most comprehensive platform for energy and environmental regulatory intelligence, powered by cutting-edge AI and machine learning technology.

sales@enerknol.com
212-537-4797
175 Greenwich St, FL-38, New York, NY 10007

Product

  • Platform Overview
  • EKAI Assistant
  • Coverage Areas

Resources

  • Case Studies
  • API Documentation

Company

  • About Us
  • Careers
  • New York Energy Week

Legal

  • Terms of Service
© 2026 EnerKnol. All rights reserved.
Book a Demo