Log in



Lost your password?
  • FREE TRIAL
  • ABOUT
    • About EnerKnol
    • Company News
    • Careers at EnerKnol
    • Press
  • PRODUCT
    • About the EnerKnol Platform
    • Why EnerKnol
    • Source Coverage
    • Get Access to the EnerKnol Platform
  • ANALYST RESEARCH
    • Renewables
    • Environmental Markets
    • Fossil Fuels
    • Power & Utilities
    • View All Research
    • Get EnerKnol Research
  • EVENTS
    • EnerKnol Calendar
    • New York Energy Week
  • NEWS
  • SUBSCRIBE
MENU
Login

Access the EnerKnol platform

EnerKnol
EnerKnol is the leading provider of regulatory data, analytics, and tracking software for North American energy markets
EnerKnol
  • FREE TRIAL
  • ABOUT
    • About EnerKnol
    • Company News
    • Careers at EnerKnol
    • Press
  • PRODUCT
    • About the EnerKnol Platform
    • Why EnerKnol
    • Source Coverage
    • Get Access to the EnerKnol Platform
  • ANALYST RESEARCH
    • Renewables
    • Environmental Markets
    • Fossil Fuels
    • Power & Utilities
    • View All Research
    • Get EnerKnol Research
  • EVENTS
    • EnerKnol Calendar
    • New York Energy Week
  • NEWS
  • SUBSCRIBE
Search:
California Examines Rules for Proactive De-energization of Power Lines During Wildfire Threats

The California Public Utilities Commission launched a proceeding to explore how de-energization has affected the state and examine ways to refine the practice to ensure safety and minimize unintended consequences, according to a Dec. 13 press release. The agency aims to study the conditions in which proactive and planned de-energization takes place and also examine whether there are ways to reduce the need for the practice as it can leave essential facilities without power. The proceeding seeks to develop best practices, set criteria for evaluating de-energization programs, ensure that utilities coordinate with first responders, and lower the impact on vulnerable populations.

The agency noted that several factors have led to increased wildfire events in the state, including an extended period of drought exceeding 10 years. Energized power lines exacerbate wildfire conditions. In May, the Department of Forestry and Fire Protection found that wildfires that occurred last October were caused by trees coming into contact with Pacific Gas & Electric Company’s power lines. The recent Camp Fire in Butte County was the largest in California’s history.

In September, the state enacted legislation providing a pathway for electric utilities to retroactively recover some of the billions of dollars of costs they face from the catastrophic wildfires that ravaged the state last year, while also imposing stiffer penalties for violations and stricter rules for mitigating risks. The commission also commenced rulemaking for wildfire mitigation plans in October and expects to adopt plans before the next wildfire season.

December 17, 2018
Share
TweetShare on Twitter Share on FacebookShare on Facebook Share on LinkedInShare on LinkedIn

Post navigation

PreviousPrevious post:New York Adopts Targets to Achieve 3 Gigawatts Energy Storage, Double Energy Efficiency ProgressNextNext post:National Grid Faces New York Commission Action for Gas Safety Violation

Related Research

Ohio Lawmakers Pass Bill to Revoke $1.1 Billion Nuclear Subsidy
U.S. Energy Department Awards $800 Million for Small Modular Reactor Projects in Tennessee and Michigan
December 3, 2025
solar panels wind turbines with clouds sky renewable energy 1
MISO Advances 15 New Projects Through Accelerated Interconnection Review as Reliability Pressures Mount
December 2, 2025
EnerKnol Research PU Visual Primer Trumps Fossil Fuel Push 2025 12 02 Blog preview
Federal Policy Shifts Reinforce U.S. Fossil Fuel Push
December 1, 2025
EnerKnol Research PU Visual Primer Trumps Fossil Fuel Push 2025 12 02 Blog preview
Visual Primer: Federal Policy Shifts Reinforce U.S. Fossil Fuel Push
December 1, 2025
Colorado Passes Bill Aiming for 90 Percent Emissions Reduction by 2050
EPA Finalizes Extensions of Methane Emission Requirements for Oil and Gas Industry
December 1, 2025
New York Advances $485 Million Transmission Project to Enhance Grid Reliability, Support Renewables
New York Launches $300 Million POWER UP Program to Prepare Industrial Sites for Advanced Manufacturing
December 1, 2025
Week Ahead: AI Infrastructure Development, RGGI’s Carbon Auction, NY’s Climate Smart Communities Project
November 26, 2025
U.S. Energy Department Awards $28 Million to Enhance Energy Infrastructure Cybersecurity
U.S. Energy Department Launches Genesis Mission to Accelerate Artificial Intelligence in Energy and National Security
November 26, 2025
  • Renewables
    • Biofuels
    • Electric Vehicles
    • Hydropower
    • Nuclear Power
    • Solar Power
    • Wind Power
  • Environmental Markets
    • Carbon Markets
    • Emissions
  • Fossil Fuels
    • Coal Power
    • Natural Gas
    • Oil
  • Power & Utilities
    • Energy Efficiency
    • Energy Storage
    • Retail Power & Gas
    • Smart Grid
    • Wholesale Markets

Subscribe To Our Research Newsletter!


First Name *
Last Name *
Email Address *
Phone *
Company *
Job Title *
Select any sectors you're interested in

Submit Form
https://enerknol.com/?p=25828
EnerKnol
Copyright (C) EnerKnol, Inc. | 175 Greenwich Street, FL-38 New York, NY 10007 | (212) 537-4797 | sales@enerknol.com | Terms & Conditions       Visit EnerKnol on YouTube  Visit EnerKnol on Facebook  Visit EnerKnol on Twitter  Visit EnerKnol on LinkedIn