Log in



Lost your password?
  • FREE TRIAL
  • ABOUT
    • About EnerKnol
    • Company News
    • Careers at EnerKnol
    • Press
  • PRODUCT
    • About the EnerKnol Platform
    • Why EnerKnol
    • Source Coverage
    • Get Access to the EnerKnol Platform
  • ANALYST RESEARCH
    • Renewables
    • Environmental Markets
    • Fossil Fuels
    • Power & Utilities
    • View All Research
    • Get EnerKnol Research
  • EVENTS
    • EnerKnol Calendar
    • New York Energy Week
  • NEWS
  • SUBSCRIBE
MENU
Login

Access the EnerKnol platform

EnerKnol
EnerKnol is the leading provider of regulatory data, analytics, and tracking software for North American energy markets
EnerKnol
  • FREE TRIAL
  • ABOUT
    • About EnerKnol
    • Company News
    • Careers at EnerKnol
    • Press
  • PRODUCT
    • About the EnerKnol Platform
    • Why EnerKnol
    • Source Coverage
    • Get Access to the EnerKnol Platform
  • ANALYST RESEARCH
    • Renewables
    • Environmental Markets
    • Fossil Fuels
    • Power & Utilities
    • View All Research
    • Get EnerKnol Research
  • EVENTS
    • EnerKnol Calendar
    • New York Energy Week
  • NEWS
  • SUBSCRIBE
Search:
Eight-Year Plan for Renewable Energy Credit Purchases

Connecticut Light & Power Co., an affiliate of Eversource Energy, and The United Illuminating Co. filed amended plans on January 22 for the purchase of renewable energy credits to comply with Connecticut’s Low and Zero Emissions Renewable Energy Credit Program.

  •  The annual LREC target for years 6-8 remains approximately $3.2 million for Eversource and approximately $0.8 million for UI.
  •  The annual ZREC target for years 6-8 is approximately $3.2 million for Eversource and approximately $0.8 million for UI.
  •  The Low and Zero Emissions Renewable Energy Credit Program entails spending of $1,140,000,000, using 15-year contracts.
  •  For years one through five, the plan calls for spending $300 million on LRECs and $600 million on ZRECs.
  •  For years six through eight the plan calls for spending $60,000,000 each for LRECs and ZRECs.
  •  The companies must purchase class I renewable energy credits under fifteen year contracts with owners or developers of renewable energy projects in Connecticut.
  •  The price for individual LRECs procured by the companies to be capped at $200 per REC, while ZRECs will be capped at $350 per REC in the first year’s solicitation.
  •  Price cap for subsequent years’ solicitations may decline, with a maximum decline of 7% and a minimum decline of 3% from the previous cap, with possible greater cuts in the price cap for contracts entered into in year seven and year eight.
  •  Projects must be behind the meter, and may not exceed 1,000 kW nameplate capacity for ZRECs or 2,000 kW nameplate capacity for LRECs. All projects must enter into operation on or after July 1, 2011.
January 22, 2019
Share
TweetShare on Twitter Share on FacebookShare on Facebook Share on LinkedInShare on LinkedIn

Post navigation

PreviousPrevious post:Liberty Utilities Wins Approval for Customer-Sited Battery Pilot in New HampshireNextNext post:Vermont State Lawmaker Proposes Bill to Offset Siting Impacts of Solar Facilities

Related Research

EnerKnol Research PU Visual Primer Solar Power 2026 01 27 Blog preview
State Policies Drive Solar Momentum Amid Federal Constraints
January 26, 2026
EnerKnol Research PU Visual Primer Solar Power 2026 01 27 Blog preview
Visual Primer: State Policies Drive Solar Momentum Amid Federal Constraints
January 26, 2026
Pennsylvania Sets Emissions Reduction Goals in Line With Paris Climate Accord
U.S. Energy Department Announces $155 Million for 16 National Lab Projects to Boost Industrial Innovation
January 23, 2026
U.S. Energy Department Overhauls Energy Loan Portfolio, Targets $83 Billion in Biden-Era Commitments
January 23, 2026
Ohio Regulator Approves FirstEnergy's Auction Results to Set Default Power Rates
New Jersey Governor Signs Orders to Freeze Rate Hikes, Fast-Track New Power Supply
January 22, 2026
U.S. Energy Department to Invest $120 Million in Research Center to Advance Next Generation Battery Technology
PJM Board Unveils 2026 Grid Action Package to Integrate Data Centers and Strengthen Reliability
January 20, 2026
EnerKnol Research PU Visual Primer Energy Storage 2026 01 20 Blog preview
Battery Storage Takes a Larger Role in Grid Modernization
January 19, 2026
EnerKnol Research PU Visual Primer Energy Storage 2026 01 20 Blog preview
Visual Primer: Battery Storage Takes a Larger Role in Grid Modernization
January 19, 2026
  • Renewables
    • Biofuels
    • Electric Vehicles
    • Hydropower
    • Nuclear Power
    • Solar Power
    • Wind Power
  • Environmental Markets
    • Carbon Markets
    • Emissions
  • Fossil Fuels
    • Coal Power
    • Natural Gas
    • Oil
  • Power & Utilities
    • Energy Efficiency
    • Energy Storage
    • Retail Power & Gas
    • Smart Grid
    • Wholesale Markets

Subscribe To Our Research Newsletter!


First Name *
Last Name *
Email Address *
Phone *
Company *
Job Title *
Select any sectors you're interested in

Submit Form
https://enerknol.com/?p=26464
EnerKnol
Copyright (C) EnerKnol, Inc. | 175 Greenwich Street, FL-38 New York, NY 10007 | (212) 537-4797 | sales@enerknol.com | Terms & Conditions       Visit EnerKnol on YouTube  Visit EnerKnol on Facebook  Visit EnerKnol on Twitter  Visit EnerKnol on LinkedIn