Log in



Lost your password?
  • FREE TRIAL
  • ABOUT
    • About EnerKnol
    • Company News
    • Careers at EnerKnol
    • Press
  • PRODUCT
    • About the EnerKnol Platform
    • Why EnerKnol
    • Source Coverage
    • Get Access to the EnerKnol Platform
  • ANALYST RESEARCH
    • Renewables
    • Environmental Markets
    • Fossil Fuels
    • Power & Utilities
    • View All Research
    • Get EnerKnol Research
  • EVENTS
    • EnerKnol Calendar
    • New York Energy Week
  • NEWS
  • SUBSCRIBE
MENU
Login

Access the EnerKnol platform

EnerKnol
EnerKnol is the leading provider of regulatory data, analytics, and tracking software for North American energy markets
EnerKnol
  • FREE TRIAL
  • ABOUT
    • About EnerKnol
    • Company News
    • Careers at EnerKnol
    • Press
  • PRODUCT
    • About the EnerKnol Platform
    • Why EnerKnol
    • Source Coverage
    • Get Access to the EnerKnol Platform
  • ANALYST RESEARCH
    • Renewables
    • Environmental Markets
    • Fossil Fuels
    • Power & Utilities
    • View All Research
    • Get EnerKnol Research
  • EVENTS
    • EnerKnol Calendar
    • New York Energy Week
  • NEWS
  • SUBSCRIBE
Search:
Eight-Year Plan for Renewable Energy Credit Purchases

Connecticut Light & Power Co., an affiliate of Eversource Energy, and The United Illuminating Co. filed amended plans on January 22 for the purchase of renewable energy credits to comply with Connecticut’s Low and Zero Emissions Renewable Energy Credit Program.

  •  The annual LREC target for years 6-8 remains approximately $3.2 million for Eversource and approximately $0.8 million for UI.
  •  The annual ZREC target for years 6-8 is approximately $3.2 million for Eversource and approximately $0.8 million for UI.
  •  The Low and Zero Emissions Renewable Energy Credit Program entails spending of $1,140,000,000, using 15-year contracts.
  •  For years one through five, the plan calls for spending $300 million on LRECs and $600 million on ZRECs.
  •  For years six through eight the plan calls for spending $60,000,000 each for LRECs and ZRECs.
  •  The companies must purchase class I renewable energy credits under fifteen year contracts with owners or developers of renewable energy projects in Connecticut.
  •  The price for individual LRECs procured by the companies to be capped at $200 per REC, while ZRECs will be capped at $350 per REC in the first year’s solicitation.
  •  Price cap for subsequent years’ solicitations may decline, with a maximum decline of 7% and a minimum decline of 3% from the previous cap, with possible greater cuts in the price cap for contracts entered into in year seven and year eight.
  •  Projects must be behind the meter, and may not exceed 1,000 kW nameplate capacity for ZRECs or 2,000 kW nameplate capacity for LRECs. All projects must enter into operation on or after July 1, 2011.
January 22, 2019
Share
TweetShare on Twitter Share on FacebookShare on Facebook Share on LinkedInShare on LinkedIn

Post navigation

PreviousPrevious post:Liberty Utilities Wins Approval for Customer-Sited Battery Pilot in New HampshireNextNext post:Vermont State Lawmaker Proposes Bill to Offset Siting Impacts of Solar Facilities

Related Research

Vermont Legislation Creates Initiatives to Cut emissions From Thermal Energy, Transportation Sectors
Trump Administration Proposes to Roll Back Fuel Economy Standards
December 5, 2025
Ohio Lawmakers Pass Bill to Revoke $1.1 Billion Nuclear Subsidy
U.S. Energy Department Awards $800 Million for Small Modular Reactor Projects in Tennessee and Michigan
December 3, 2025
solar panels wind turbines with clouds sky renewable energy 1
MISO Advances 15 New Projects Through Accelerated Interconnection Review as Reliability Pressures Mount
December 2, 2025
EnerKnol Research PU Visual Primer Trumps Fossil Fuel Push 2025 12 02 Blog preview
Federal Policy Shifts Reinforce U.S. Fossil Fuel Push
December 1, 2025
EnerKnol Research PU Visual Primer Trumps Fossil Fuel Push 2025 12 02 Blog preview
Visual Primer: Federal Policy Shifts Reinforce U.S. Fossil Fuel Push
December 1, 2025
Colorado Passes Bill Aiming for 90 Percent Emissions Reduction by 2050
EPA Finalizes Extensions of Methane Emission Requirements for Oil and Gas Industry
December 1, 2025
New York Advances $485 Million Transmission Project to Enhance Grid Reliability, Support Renewables
New York Launches $300 Million POWER UP Program to Prepare Industrial Sites for Advanced Manufacturing
December 1, 2025
U.S. Energy Department Awards $28 Million to Enhance Energy Infrastructure Cybersecurity
U.S. Energy Department Launches Genesis Mission to Accelerate Artificial Intelligence in Energy and National Security
November 26, 2025
  • Renewables
    • Biofuels
    • Electric Vehicles
    • Hydropower
    • Nuclear Power
    • Solar Power
    • Wind Power
  • Environmental Markets
    • Carbon Markets
    • Emissions
  • Fossil Fuels
    • Coal Power
    • Natural Gas
    • Oil
  • Power & Utilities
    • Energy Efficiency
    • Energy Storage
    • Retail Power & Gas
    • Smart Grid
    • Wholesale Markets

Subscribe To Our Research Newsletter!


First Name *
Last Name *
Email Address *
Phone *
Company *
Job Title *
Select any sectors you're interested in

Submit Form
https://enerknol.com/?p=26464
EnerKnol
Copyright (C) EnerKnol, Inc. | 175 Greenwich Street, FL-38 New York, NY 10007 | (212) 537-4797 | sales@enerknol.com | Terms & Conditions       Visit EnerKnol on YouTube  Visit EnerKnol on Facebook  Visit EnerKnol on Twitter  Visit EnerKnol on LinkedIn